Environmental
moloto-1

Moloto Development Corridor Feasibility Study

Gauteng, South Africa

The Moloto Development Corridor runs along the R573 (Moloto road) – from the N11 in Siyabuswa, through KwaMhlanga to city of Tshwane where it ends at the N1. The total length of this corridor is estimated to be 134 km. Feasibility Study and Development plan.

irpts-polokwane

Integrated Rapid Public Transport Road System

Polokwane, Limpopo, South Africa

Environmental Management Compliance of the Integrated Rapid Public Transport System (IRPTS) project, Polokwane Municipality. Design and construct a network of Bus Rapid Transit (BRT) Lines in the city of Polokwane, providing an efficient public transport system for the city.

thyspunt

Thuyspunt- 400 kV Transmission Power Lines Environmental Impact Permit

Eastern Cape, South Africa

Environmental Impact Assessment (EIA) for the proposed construction of the Thuyspunt-Port Elizabeth 400 kV Transmission Power Lines, the proposed Port Elizabeth Transmission Substation and associated infrastructure, and the Upgrading of the Grassridge and Dedisa Transmission Substations. The integration of electricity to be generated by the proposed Thyspunt Nuclear Power Station.

renishaw

Renishaw Mixed Use Development

Scottburgh, KwaZulu-Natal, South Africa

Environmental Impact Assessment for 1800ha mixed use development.

n7-upgrade-trawal-vanrhynsdorp-olifants-bridge

N7 Road Upgrade Project from Clanwilliam to Vanrhynsdorp to Trawal

Western Cape, South Africa

National Road (N7) upgrade project. Clanwilliam to Vanrhynsdorp, and from Vanrhynsdorp to Trawal. Environmental Impact Analysis (EIA) permit.

Environmental Control Officer for the Etafuleni Low-cost Housing construction process

Environmental Control Officer for the Etafuleni Low-cost Housing construction process

Durban, South Africa

Environmental monitoring and audit reports for the in-situ construction low cost housing units at Etafuleni, west of Durban.

clanwilliam-dam

Clanwilliams Dam Environmental Auditing

Western Cape, South Africa

Environmental auditing of the Raising of the Clanwilliam Storage Dam Wall for the Department of Water and Sanitation.

sir-lowries-pass

Sir Lowries River Upgrade Project

Western Cape, South Africa

Basic Assessment Analysis for the flood alleviation measures for the Sir Lowries River, including Engineering solutions determination and design.

brackenfell-and-durbanville-rezoning

Brackenfell and Durbanville Rezoning of Public Open Space to Group Housing

Western Cape, South Africa

Basic Assessment for the Rezoning and Subdivision of Erf 501 and Erf 4141, Brackenfell from Public Open Space to Group Housing; and Basic Assessment for the proposed rezoning and subdivision of Erf 7058 and Erf 7060, Durbanville from Public Open Space to Group Housing.

nonoti-1

Nonoti Beach Tourism Resort Development for the Industrial Development Corporation (IDC)

KwaZulu-Natal, South Africa

Environmental Impact Analysis (EIA) and permit for the proposed 500-bed, 4-star Nonoti Beach Tourism Resort.